West Union, West Virginia
Sherwood VII Cryogenic Plant
Client / Owner
MarkWest Liberty Midstream & Resources, L.L.C.
Market
Process
Oil, Gas & Chemicals
Company
Graycor Industrial
Project Scope
MarkWest called upon Graycor Industrial Constructors to expand the Sherwood Processing Facility by constructing a seventh cryogenic gas processing plant at the West Union, West Virginia, complex.
The scope of work to build the 200-MMscf/d cryogenic unit included civil, electrical, instrumentation and mechanical, as well as substation construction. Graycor’s team self-performed all equipment setting, steel erection, and piping fabrication and installation. Startup and commissioning was also conducted in the project’s final stage.
Civil Scope:
• Drill caissons: 127
• Foundations: Over 50 varying
• Rebar: 155 tons
• Concrete: 3,500 cubic yards
• Schedule: 1-10-6 for 12 weeks
Piping Installation:
• Piping: 16,278 linear feet
• Fabricated spools: 851
• Field welds: 581
Electrical Scope:
• Grounding
• Duct banks
• MCC building electrical equipment installation
• Substation installation
• Cable tray and conduit
• Heat trace
• Plant alarm
• Instrumentation
• Electrical cable: 276,156 linear feet
Equipment Installation:
• 52 pieces ranging from 10,000 lbs. to 256,000 lbs.